Mark Matson for American-Statesman ( 8/10/12) Work continues at the Circuit of the Americasin anticipation of the 2012 Formula 1 United States Grand Prix, on November 16-18. Next week, a final paving process will begin on the racetrack. This pedestrian bridge will link areas of the track, such as the amphitheater and tower in the background.
Add to Cart Download